九州彩票网_九州彩票平台_九州彩票登录-官网

    <dir id='iqcw6'><del id='iqcw6'><del id='iqcw6'></del><pre id='iqcw6'><pre id='iqcw6'><option id='iqcw6'><address id='iqcw6'></address><bdo id='iqcw6'><tr id='iqcw6'><acronym id='iqcw6'><pre id='iqcw6'></pre></acronym><div id='iqcw6'></div></tr></bdo></option></pre><small id='iqcw6'><address id='iqcw6'><u id='iqcw6'><legend id='iqcw6'><option id='iqcw6'><abbr id='iqcw6'></abbr><li id='iqcw6'><pre id='iqcw6'></pre></li></option></legend><select id='iqcw6'></select></u></address></small></pre></del><sup id='iqcw6'></sup><blockquote id='iqcw6'><dt id='iqcw6'></dt></blockquote><blockquote id='iqcw6'></blockquote></dir><tt id='iqcw6'></tt><u id='iqcw6'><tt id='iqcw6'><form id='iqcw6'></form></tt><td id='iqcw6'><dt id='iqcw6'></dt></td></u>
  1. <code id='iqcw6'><i id='iqcw6'><q id='iqcw6'><legend id='iqcw6'><pre id='iqcw6'><style id='iqcw6'><acronym id='iqcw6'><i id='iqcw6'><form id='iqcw6'><option id='iqcw6'><center id='iqcw6'></center></option></form></i></acronym></style><tt id='iqcw6'></tt></pre></legend></q></i></code><center id='iqcw6'></center>

      <dd id='iqcw6'></dd>

        <style id='iqcw6'></style><sub id='iqcw6'><dfn id='iqcw6'><abbr id='iqcw6'><big id='iqcw6'><bdo id='iqcw6'></bdo></big></abbr></dfn></sub>
        <dir id='iqcw6'></dir>
      1. CN

        Drive service introduction

         

        KEYPOINT furnish with the Completion/Commissioning Services for the Overseas petro-chemical projects, which mainly including Pre-Commissioning, Commissioning/Start-up, Trial-run and the Operating / Maintenance personnel training.

        一、Completion/Commissioning Services Scope:

        Pre-commissioning

        the performance of loop tests and static-, de-energized-, (“cold-”) functional tests for equipment and components, to ensure that the functional conditions conform to the designed purpose and intended service

        Commissioning

        activities will include the preparatory works and checks prior to the introduction of hydrocarbons and the subsequent introduction of hydrocarbons into the system and the performance of functional and leak tests (“hot”).

        Start-up

        include the actual start-up and running of process equipment (typically in close loop) and the performance of operational tests so as to achieve and demonstrate the readiness of the Project for the performance of Trial Operation

        Trial Operation

        the duration of this period shall be fifteen (15) successive days which may be prolonged if required to complete relevant tests, such as the reliability and performance tests that shall be completed during the trial operation phase

        Training

        Mainly include the Operator Classroom Knowledge Training and the Operator On-Job Practical Training during the Completion / Commissioning process

        二、Completion/Commissioning Execution Philosophy

        Prepare

        Resource Organization / Scope Definition / Plant Systemization / Design Reviews / Schedule Development

        Interface & Handover Alignment / Electronic Libraries Establishment

        Completion Plan Initiation / Initial Fill Chemicals Determining

        Completion Manual & Procedures / SOPs / Training Package Compiling & Development

        PTW (Permit to Work) Systems Setup and Agree with all interested Parties

        Implement

        Pre-commissioning related Activities/Tests/Checks; Stage Handover with Document; Certificate from Client

        Commissioning/Start-up related Activities/Tests/Checks; Stage Handover with document; Certificate from Client

        Trial Operation related Activities/Tests/Checks; Stage Handover with document; Certificate from Client

        Operation / Maintenance Personnel Training 

        Closed-out

        Close-out Punch Items / Permit from Authority / Project Take-over certificate from Client

        三、Extended Service Scope

        Normal Construction Service Scope:

        图片1.png

        Extended Service Scope by KEYPOINT:

        图片2.png

        四、Resources

        Completion/Commissioning Experts Team Consisted as below due to the different Projects:

        Completion Manager:Entire Completion Services Organization & Coordination

        Process Package Suppliers :(if any applied for project) Provisions of process package files and Instructions on commissioning / operation

        Senior Process Engineers:Related P&ID Review, Breakdown Systems / sub-systems

        Senior Operation Experts:Preparation of Operation / Maintenance plans & procedures; Completion Execution

        Senior Discipline Engineers:Preparation of Completion & Training Plan & Procedure; Completion Execution

        五、Typical Organization Chart

        图片3.png

        六、Normal Completion/Commissioning Files Preparation

        General Files

        Completion Manual / Completion Interface Plan & Matrix / Completion Quality Plan / Completion HES Plan / Completion

        Schedule (Level 4) / Operator Training Package

        Pre-Commissioning Files

        Pre-Commissioning Procedure / Status & Test Record Sheet / Activity & Check & Punch List

        Commissioning/Start-up Files

        Commissioning & Start-up Procedure / Status & Test Record Sheet / Activity & Check & Punch List

        Chemical Material & Consumable & Energy List / Permit to Work (PTW) System

        Trial Operation Files

        Operation & Maintenance Manual / Job Description / Operation & Maintenance Plan/ Operation & Maintenance & Repair Procedure

        Emergency Response Plan for Operation & Start-up / Patrolling Plans and Procedures / Test & Record Sheet / Activity & Check & Punch List


        add:上海市闵行区浦江镇联航路1188号 浦江智谷商业园10号楼1楼A座
        邮 编:201112
        传真:+ 86 21 5851 5222
        邮箱:info@isucoz.com

        Follow WeChat:
        Follow WeChat:

        add:上海市闵行区浦江镇联航路1188号 浦江智谷商业园10号楼1楼A座
        邮 编:201112
        传真:+ 86 21 5851 5222
        邮箱:info@isucoz.com

        上海九州彩票网机电设备有限公司版权所有
        Copyright©2013 KEYPOINT Controls. All Rights Reserved    

        Powered by Yongsy